Home / Azure

AzureHow-toAdvanced

Advisory: choosing a DR pattern per workload on Azure - backup-restore, pilot light, warm standby or active-active

A design guide for matching each workload to a disaster recovery pattern on Azure. Classify by business impact, translate RTO and RPO into a pattern, map each tier (compute, data, network, identity) to Azure services, and check the hidden dependencies that break recoveries.

Deepak Bhardwaj4 min read

Applies toAzure VMs, App Service, AKS, Azure SQL, Storage, Cosmos DB; Azure Site Recovery, Azure Backup, failover groups, Front Door/Traffic Manager

Four patterns

Pattern Secondary region during normal running Typical RTO Typical RPO Relative cost
Backup and restore Nothing running; backups replicated Hours to days Hours (backup frequency) Low
Pilot light Data replicated; compute off or minimal Hours Minutes Low-medium
Warm standby Scaled-down full stack running Minutes to an hour Seconds to minutes Medium-high
Active-active Full capacity in both regions serving traffic Near zero Near zero (engine-dependent) High

Numbers are typical ranges, not guarantees. Your own drills decide what you actually achieve.

1. Classify workloads

Tier Example Target
Tier 0 Identity, DNS, network connectivity Must work first; designed with the platform
Tier 1 Customer-facing revenue apps Warm standby or active-active
Tier 2 Internal business apps Pilot light
Tier 3 Reporting, dev/test, archives Backup and restore

Agree targets with the business owner, not just IT. Higher tiers cost more every month whether or not a disaster happens.

2. Map each layer to services

Layer Backup-restore Pilot light Warm standby Active-active
VMs Azure Backup cross-region restore Site Recovery replication Site Recovery / running scaled VMs Running VMs both regions
App Service / Functions Redeploy from IaC Redeploy from IaC + pre-created plan Running app in both regions Both regions behind Front Door
AKS Rebuild from IaC + GitOps, restore volumes Pre-created cluster, scaled to 0 user nodes Running cluster, minimal replicas Both clusters serving
Azure SQL Geo-restore Geo-replica / failover group Failover group Failover group (read in secondary) or app-level sharding
Storage GRS / GZRS GRS + tested failover RA-GZRS, app reads secondary App-level dual writes / object replication
Cosmos DB Continuous backup Multi-region reads Multi-region with automatic failover Multi-region writes
Traffic DNS change DNS change / Traffic Manager Front Door priority routing Front Door weighted/latency routing

3. Hidden dependencies that break DR

  • Identity: Entra ID is global, but on-prem AD DS domain controllers, AD FS, and app secrets in a single-region Key Vault are not. Replicate or pre-provision.
  • Networking: secondary hub, firewall rules, private DNS zones linked to secondary VNets, ExpressRoute/VPN to the secondary region.
  • Secrets and certificates: Key Vault in the secondary region with the same secrets; certificates valid for the DR hostnames.
  • Quotas and capacity: vCPU quota and GPU capacity in the secondary region (consider capacity reservations for Tier 1).
  • Third parties: allow-lists at partners using primary-region IPs.
  • Monitoring: alerts and dashboards that only watch primary resources.

4. Decide the failover trigger

Who declares a disaster, using which signals, and after how long? Automatic failover at the data layer (failover groups with automatic policy) versus manual decision is a business decision. Document it with names.

5. Test it

A design without a drill is a guess. Run at least an annual DR test per Tier 1/2 workload (see the DR drill post), and record achieved RTO/RPO next to the targets.

Design review questions

  • What's the RTO/RPO, who agreed it, and does the pattern meet it on paper?
  • What's the order of recovery across dependent workloads?
  • What still points at the primary region (DNS names, IPs, connection strings)?
  • How do you fail back?

Tip

Zone redundancy inside a region handles far more real incidents than region failover. Get zone resilience right for Tier 1 and 2 before investing in active-active across regions.

Checklist

  • Workloads tiered with business-agreed RTO/RPO
  • Pattern chosen per tier and mapped per layer
  • Identity, network, secrets, quota and third-party dependencies covered
  • Failover decision process documented
  • Drill scheduled; achieved RTO/RPO recorded
  • Failback plan written